
VDI 12X5R 2000 G9 Long lead screws
by Astralinear
Rolled screw shaft lead precision G9 stainless steel.
Product Details:
- Type: Screws
- Nominal screw diameter: 12
- Pieces/ package: 1
Specifications:
- d0[mm]: 12
- d1[mm]: 11.8
- d2[mm]: 9.3
- ph[mm]: 5
- Hand: R
- Lead precision: G9
- L[mm]: 2000
Compliance &, safety &, labels:
- ECCN: Not controlled
- Danger class: N
- Country of origin: France
- Net Weight (kg): 1.491
- Designation/ Alt. designation: VDI 12X5R 2000 G9