
VD 10X5R 1000 G9 Long lead screws
by Astralinear
Rolled screw shaft lead precision G9.
Product Details:
- Type: Screws
- Nominal screw diameter: 10
- Pieces/ package: 1
Specifications:
- d0[mm]: 10
- d1[mm]: 8.9
- d2[mm]: 7.4
- ph[mm]: 5
- Hand: R
- Lead precision: G9
- L[mm]: 1000
Compliance &, safety &, labels:
- ECCN: Not controlled
- Danger class: N
- Country of origin: France
- Net Weight (kg): 0.452
- Designation/ Alt. designation: VD 10X5R 1000 G9