
VD 32X40R 5700 G7 Long lead screws
by Astralinear
Rolled screw shaft lead precision G7.
Product Details:
- Type: Screws
- Nominal screw diameter: 32
- Pieces/ package: 1
Specifications:
- d0[mm]: 32
- d1[mm]: 29.6
- d2[mm]: 26.9
- ph[mm]: 40
- Hand: R
- Lead precision: G7
- L[mm]: 5700
Compliance &, safety &, labels:
- ECCN: Not controlled
- Danger class: N
- Country of origin: France
- Net Weight (kg): 27.93
- Designation/ Alt. designation: VD 32X40R 5700 G7