
VD 50X50R 5700 G7 Long lead screws
by Astralinear
Rolled screw shaft lead precision G7.
Product Details:
- Type: Screws
- Nominal screw diameter: 50
- Pieces/ package: 1
Specifications:
- d0[mm]: 50
- d1[mm]: 49.1
- d2[mm]: 43.5
- ph[mm]: 50
- Hand: R
- Lead precision: G7
- L[mm]: 5700
Compliance &, safety &, labels:
- ECCN: Not controlled
- Danger class: N
- Country of origin: France
- Net Weight (kg): 75.24
- Designation/ Alt. designation: VD 50X50R 5700 G7